Project category: $10 Million +

  • Oran Park Baseball

    Oran Park Baseball

    Oran Park Baseball

    Oran Park

    HOW WE DELIVERED

    EXCELLENCE

    • Delivered a structurally robust facility designed to withstand high-use sporting environments.
    • Executed premium finishes and high-quality internal fit-out throughout the amenity building.
    • Engineered practical spectator zones with durable tiered seating and weather protection.

    HOW WE DELIVERED

    ENGAGEMENT

    • Collaborated closely with stakeholders to understand operational requirements and site constraints.
    • Provided clear communication across every design, planning, and construction milestone.
    • Ensured the facility layout, services, and amenities aligned with long-term community use.

    THE CHALLENGE

    Delivering a specialised baseball amenity building required precision construction, seamless integration of complex services, and durable design solutions capable of supporting both high traffic and outdoor sporting conditions. The project demanded robust infrastructure, weather protection, and carefully planned spectator facilities, while maintaining efficiency across excavation, structural works, and services coordination.

    THE SOLUTION

    SHEETH delivered a complete single-storey masonry facility with a steel roof system, integrated louvers for ventilation, and a fully executed internal fit-out. Tiered seating and bleachers were installed to elevate the spectator experience, while a concrete perimeter with an overhanging roof provided essential protection from the elements. Our team executed detailed excavation for the raft slab and footings, coordinated all major services, and managed the precise installation and commissioning of plant room systems, ensuring the asset is functional, resilient, and built to endure.

  • Gaffa Gallery

    Gaffa Gallery

    Gaffa Gallery

    Sydney

    HOW WE DELIVERED

    EXCELLENCE

    • Delivered an architecturally rich revitalisation that balances heritage restoration with contemporary design.
    • Executed complex structural upgrades, including the rooftop bar with a custom glass canopy and twisted louvres.
    • Retained and celebrated original character while introducing high-end finishes and modern amenities.

    HOW WE DELIVERED

    ENGAGEMENT

    • Worked closely with heritage consultants to ensure every design move respected and enhanced the building’s historical value.
    • Provided clear staging plans to reduce disruption during complex structural and heritage works.
    • Maintained strong communication with all stakeholders, including tenants and gallery operators, to align functionality with vision.

    THE CHALLENGE

    The transformation of 281 Clarence St required converting a former police station into a vibrant mixed-use destination while preserving its significant heritage character. The site needed to accommodate galleries, premium tenancies, and a rooftop hospitality space, all within a structure that carried strict heritage constraints and complex integration requirements across four storeys.

    THE SOLUTION

    The project sensitively reimagined the building while honouring its past. The old cell block was repurposed into a unique ground-floor home for Gaffa Gallery, while levels 1–3 were reconfigured into high-end, exclusive tenancies. A contemporary rooftop bar was added, featuring a striking glass canopy with twisted louvres and a zinc-clad balcony terrace that complements the restored heritage façade. Every design intervention was carefully planned to blend modern functionality with preserved historical details.

  • Haben House

    Haben House

    Haben House

    Double Bay

    HOW WE DELIVERED

    EXCELLENCE

    • Delivered deep foundation works with precision using screw piles and reinforced concrete CHS piles.
    • Executed high-quality bronze aluminium cladding for a modern and striking façade.
    • Delivered a functional rooftop garden that enhances building utility and aesthetics.

    HOW WE DELIVERED

    ENGAGEMENT

    • Maintained transparent communication throughout complex foundation and cladding works.
    • Provided regular updates and on-site walkthroughs to align stakeholders on progress and solutions.
    • Collaborated closely with architects, engineers, and stakeholders to ensure design and structural requirements were met.

    THE CHALLENGE

    Haben House in Double Bay presented a complex mixed-use development challenge. The project required delivering street-level retail, three office floors, and two amenity levels atop a 21-meter-high structure, all while ensuring structural integrity in a challenging site environment. Key issues included deep foundation works, managing groundwater with an advanced dewatering system, and coordinating multiple building uses within a compact urban footprint.

    THE SOLUTION

    SHEETH executed the project using meticulous planning and precision engineering. The structure was founded on 81 screw piles (8 meters deep) and 116 reinforced concrete CHS piles to ensure stability. A sophisticated dewatering system maintained dry conditions for basement slab pours, while bronze aluminium cladding was installed to give the building a modern, striking façade. Each of the five levels spans 280m², culminating in a rooftop garden that combines aesthetic appeal with functional outdoor space, seamlessly integrating retail, office, and amenity areas.