Project category: Community

  • Croydon Childcare

    Croydon Childcare

    Croydon Childcare

    Croydon

    HOW WE DELIVERED

    EXCELLENCE

    • Complete structural strip-out and transformation of a 2,200m² commercial building.
    • Extensive structural modifications to accommodate an architecturally designed childcare.
    • Precision delivery of detailed hard and soft landscaping on a complex, single-level plane.

    HOW WE DELIVERED

    ENGAGEMENT

    • Consistent communication to navigate regulatory requirements and design challenges.
    • Transparent progress updates throughout demolition, construction, and redevelopment phases.
    • Full design and construct service, managing design, compliance, and approvals end-to-end.

    THE CHALLENGE

    Transforming a 2,200m² former Aldi supermarket into a modern gym and architecturally designed childcare centre required extensive structural modifications, compliance navigation, and a complete redesign of services and infrastructure. As a design and construct contract, SHEETH was responsible for all design elements, childcare compliance requirements, the Development Application, and the technical challenges of reshaping the existing structure for its new purpose.

    THE SOLUTION

    SHEETH delivered a comprehensive redevelopment that included stripping the site back to bare structure, upgrading all essential services, and executing significant structural changes to support the new childcare facility. The project also involved a full car park redevelopment and detailed hard and soft landscaping, including achieving a unified level across an area previously used as a loading dock. The result is a fully reimagined multi-purpose development that meets regulatory standards and delivers modern, high-quality spaces.

  • BaptistCare Landscaping

    BaptistCare Landscaping

    BaptistCare Landscaping

    Narraweena

    HOW WE DELIVERED

    EXCELLENCE

    • Constructed safe, accessible pathways that support independent movement.
    • Installed a diverse, sensory-rich planting scheme for year-round enjoyment.
    • Maintained a high standard of craftsmanship throughout the landscape works.

    HOW WE DELIVERED

    ENGAGEMENT

    • Prioritised resident needs to create a welcoming and supportive environment.
    • Communicated progress clearly to meet critical program dates.
    • Delivered the project with minimal disruption to residents and staff.

    THE CHALLENGE

    Creating an outdoor environment that was peaceful, accessible, and enriching required careful consideration of resident mobility, safety, and sensory experience. The landscape needed to support independence while offering comfort, shade, and engaging natural elements.

    THE SOLUTION

    The team delivered a thoughtfully designed landscape featuring wide, unobstructed walking paths, abundant bench seating, considered shade structures, and a diverse planting palette that engages the senses through colour, fragrance, and seasonal change. Every detail was crafted to ensure residents could move freely, rest easily, and enjoy meaningful time outdoors with family and friends, all completed efficiently to allow residents to return to normal routines as soon as possible.

  • Willandra Village

    Willandra Village

    Willandra Village

    Narraweena

    HOW WE DELIVERED

    EXCELLENCE

    • Delivered a spacious, accessible layout tailored specifically to aged-care living.
    • Enhanced natural light and flow to create a bright, uplifting home environment.
    • Ensured all finishes and detailing aligned with comfort, safety, and long-term durability.

    HOW WE DELIVERED

    ENGAGEMENT

    • Worked closely with the client to understand resident needs and operational requirements.
    • Prioritised resident comfort and practicality at every stage of the build.
    • Collaborated with stakeholders on material selection to ensure user-friendly outcomes.

    THE CHALLENGE

    Transforming two existing aged-care apartments into one seamless, spacious unit required careful planning to improve accessibility, maximise storage, and ensure the final layout enhanced resident comfort. The design needed to balance practicality with a bright, welcoming atmosphere tailored to the unique needs of an aged-care environment.

    THE SOLUTION

    SHEETH reconfigured the two units into a single open, light-filled home with thoughtful circulation, accessible features, and highly organised storage solutions. Every detail, from joinery to layout planning, was designed to support ease of use, resident wellbeing, and long-term functionality within the village.

  • Oran Park Baseball

    Oran Park Baseball

    Oran Park Baseball

    Oran Park

    HOW WE DELIVERED

    EXCELLENCE

    • Delivered a structurally robust facility designed to withstand high-use sporting environments.
    • Executed premium finishes and high-quality internal fit-out throughout the amenity building.
    • Engineered practical spectator zones with durable tiered seating and weather protection.

    HOW WE DELIVERED

    ENGAGEMENT

    • Collaborated closely with stakeholders to understand operational requirements and site constraints.
    • Provided clear communication across every design, planning, and construction milestone.
    • Ensured the facility layout, services, and amenities aligned with long-term community use.

    THE CHALLENGE

    Delivering a specialised baseball amenity building required precision construction, seamless integration of complex services, and durable design solutions capable of supporting both high traffic and outdoor sporting conditions. The project demanded robust infrastructure, weather protection, and carefully planned spectator facilities, while maintaining efficiency across excavation, structural works, and services coordination.

    THE SOLUTION

    SHEETH delivered a complete single-storey masonry facility with a steel roof system, integrated louvers for ventilation, and a fully executed internal fit-out. Tiered seating and bleachers were installed to elevate the spectator experience, while a concrete perimeter with an overhanging roof provided essential protection from the elements. Our team executed detailed excavation for the raft slab and footings, coordinated all major services, and managed the precise installation and commissioning of plant room systems, ensuring the asset is functional, resilient, and built to endure.

  • Strathfield Library

    Strathfield Library

    Strathfield Library

    Homebush

    HOW WE DELIVERED

    EXCELLENCE

    • Delivered quality craftsmanship across all architectural and functional elements.
    • Executed complex structural and service upgrades with precision.
    • Completed a highly detailed cultural space that enhances community use and long-term functionality.

    HOW WE DELIVERED

    ENGAGEMENT

    • Maintained open communication with council and key stakeholders throughout the project.
    • Fostered strong collaboration across all consultants and trades to keep the program on track.
    • Coordinated closely with library operations to ensure smooth staging and safe public access.

    THE CHALLENGE

    Delivering a 1,950m² internal and external construction project within a fully operational library environment posed significant complexity. For the first four weeks, works had to be carefully staged around public access, safety requirements, and daily operations. The scope included full demolition, creating new openings and staircases, extensive services upgrades, and transforming both indoor and outdoor areas, all while navigating a community-facing setting and a detailed design-and-construct brief.

    THE SOLUTION

    The project was strategically phased to maintain safety and minimise disruption during the live environment period. Once the Christmas shutdown began, the team accelerated major structural, services, and fitout works to maximise efficiency. Managing the full design and construct process, including DA coordination, design development, and end-to-end delivery, ensured that each element, from joinery and bathrooms to the art gallery spaces and external areas, was completed to a high standard.

  • Redlands Campus

    Redlands Campus

    Redlands Campus

    Jindabyne

    HOW WE DELIVERED

    EXCELLENCE

    • Managed the project from concept and design through to construction for consistent quality.
    • Delivered multiple accommodation types (Class 1 and Class 3) on a single campus site.
    • Coordinated extensive civil infrastructure to support new buildings.

    HOW WE DELIVERED

    ENGAGEMENT

    • Worked closely with Redlands to align design and functional requirements from the outset.
    • Incorporated client feedback into building layouts, amenities, and infrastructure planning.
    • Coordinated stakeholders to ensure minimal disruption to ongoing campus operations.

    THE CHALLENGE

    Redlands required staff and student accommodation at their Jindabyne High Country Campus, with multiple building types and extensive infrastructure works. The challenge was to manage both the design and construction of interconnected and standalone structures, including civil infrastructure, while ensuring safety, functionality, and compliance with Class 1 and Class 3 building regulations.

    THE SOLUTION

    SHEETH oversaw the project from design through construction, delivering a secondary student accommodation building (Class 3) connected to an existing facility via two corridors. We also constructed a 12-tenancy staff accommodation building (Class 3) and a free-standing family home (Class 1). Comprehensive civil infrastructure was installed to support all new structures, ensuring seamless integration with the campus while meeting regulatory and operational requirements.